Arts (125)
    Asian & African (8)
    Books (560)
    Boxes & Tea Caddies (85)
    Clocks (36)
    Decorative (398)
    Dolls & Bears (122)
    Figurines (530)
    Furniture (24)
    Glass (1736)
  ...
View All


Search our
Dealer/Mall
Stores!
 
 



Poodle, Spaghetti Trim, Ucagco




Collector Books

The Journal of Antiques and Collectibles





1954 Bonneville Salt Flats Hot Rod Land Speed Racing Magazine Article Ephemera For Sale


1954 Bonneville Salt Flats Hot Rod Land Speed Racing Magazine Article Ephemera
When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.


Buy Now

1954 Bonneville Salt Flats Hot Rod Land Speed Racing Magazine Article Ephemera:
$18.99

This captivating original magazine page from 1954 showcases the thrilling world of Bonneville Salt Flats land speed racing. Featuring multiple striking black and white photographs, it captures custom-built hot rods and specialized vehicles, including an airplane belly tank conversion driven by Leroy Holmes, reaching speeds over 302 MPH. Another image highlights a modified roadster (Car 105C) hitting 193.38 MPH and a competition coupe (549B) with a 150-gallon fuel drum. The page vividly illustrates the ingenuity and daring spirit of early hot rodders and racers at the renowned Utah salt flats.Beyond the automotive spectacle, the reverse side presents a vintage 1954 Lewyt Vacuum Cleaner advertisement, endorsed by the National Institute of Rug Cleaning, Inc., showcasing the \"automatic 4-way rug cleaning\" model. This dual-sided ephemera offers a unique glimpse into both the high-octane racing culture and domestic product advertising of the mid-1950s, making it a fascinating piece for collectors of vintage automotive memorabilia, advertising, or general 1950s Americana. The page measures approximately 10.5 x 13.5 inches, with visible wear consistent with its age.
Buy Now








Related Items:

Bonneville 1954 Vintage Style Vinyl DECAL, Car STICKER, rat rod, hot rod, racing picture

Bonneville 1954 Vintage Style Vinyl DECAL, Car STICKER, rat rod, hot rod, racing

$4.84



1954 Bonneville Salt Flats Hot Rod Land Speed Racing Magazine Article Ephemera picture

1954 Bonneville Salt Flats Hot Rod Land Speed Racing Magazine Article Ephemera

$18.99



Motor Life Magazine September 1954 Bonneville picture

Motor Life Magazine September 1954 Bonneville

$7.25






  Shopping Cart 
(Your shopping cart is empty)
Subtotal: $0.00
View Cart | Checkout


  Recently Viewed

1.  Lacquered Cedar Wood Box
2.  The White Horse Established 1742 Sign Signed
3.  Pewter Framed Tile, Plate. Ship, Sailing


  Latest Items

1.  Basket, Handpainted,
2.  Apricot Wildflower Pattern Bell
3.  Jade, Jadeite Glass Bell, Westmoreland
4.  Green Glass Strawberry Ptn. Bell
5.  Aladdin Lamp, Rose and White Moonstone


  Facebook



 


Secure Websites

Online Payments

 


| Search Items | Member Profile | My Favorites | Auto Notify | FAQ | Links | Sitemap |
Terms of Use | Privacy Policy | Tell Your Friends | Newsletters/Articles/Press Releases |


Antiques, collectibles, estate items, reproductions & art from dealers & collectors world wide at JosephMarc.
Copyright © 2004-2011 JosephMarc, Inc. All rights reserved.